Projects Icon Projects
Sao Jorge

Overview:

The São Jorge project hosts near surface gold mineralization that is potentially amenable to open pit extraction and gravity-CIL processing. The project is 4 km west of Highway BR163 and is accessed by several gravel roads that cross the property. Eldorado Goldꞌs feasibility stage Tocantinzinho deposit and Serabiꞌs Palito mine, occur along the same major structural zone that hosts the São Jorge deposit. Gold mineralization at São Jorge is hosted in granitic rocks and is associated with northwest-southeast striking shear zones. The deposit is open at depth and is prospective to the southeast.

Commodity: Gold

Ownership: 100%

Location: Para State

Infrastructure: Paved highway, water, nearby electrical power grid

Property Size: 47,646 Ha

Deposit Type: Orogenic

Resource:

  • Indicated: 14.42 Mt grading 1.54 g/t gold (715,000 oz) at 0.3 g/t gold cut-off
  • Inferred: 28.19 Mt grading 1.14 g/t gold (1,035,000 oz) at 0.3 g/t gold cut-off
  • Please refer to Resource Statement page for assumptions and notes for each respective resource estimate.

Drilling: 145 holes (37,154 m)

Technical Report: Sao Jorge 2013 Technical Report (Resource Estimate)

Images: Sao Jorge Images

Subscribe to our Newsletter

Keep up to date with our latest news and stock information